top of page

Documentation Submission for LEED is a crucial part of achieving certification, as it verifies that a building meets the LEED standards established by the U.S. Green Building Council (USGBC). This documentation process involves gathering and submitting evidence to the Green Building Certification Institute (GBCI) to validate that the project meets LEED credit requirements. Here’s an outline of the main steps and considerations in LEED documentation submission:
 

1. Identify Necessary Documentation for Each LEED Credit
 

  • Credit Templates: Each LEED credit requires specific documentation to confirm compliance. This may include design plans, calculations, cut sheets for materials, or confirmation of energy performance modeling.

  • Checklists and Summaries: LEED has detailed checklists for each category (e.g., Water Efficiency, Energy and Atmosphere, Materials and Resources) that outline required documentation and point thresholds.
     

2. Compile Supporting Documentation
 

  • Plans and Specifications: Architectural, mechanical, electrical, and plumbing plans are often necessary to demonstrate that the design complies with LEED criteria.

  • Performance Data: For credits like Energy & Atmosphere, performance data from energy modeling software or commissioning reports validate building performance.

  • Material Certifications: For sustainable materials, you’ll need documentation like Environmental Product Declarations (EPDs), Material Safety Data Sheets (MSDS), or certificates for recycled content and regional sourcing.
     

3. Utilize LEED Online for Submission
 

  • LEED Online is the digital platform where project teams upload and manage their documentation. It streamlines the process by allowing teams to submit, track, and update their credit documentation in one place.

  • Forms and Templates: LEED Online provides templates for each credit, guiding teams through the data entry process and standardizing the submission format.
     

4. Engage with LEED Reviewers
 

  • Once submitted, the GBCI’s LEED reviewers assess the documentation for completeness and accuracy. The reviewers may request additional information or clarification.

  • Preliminary Review: The initial review provides feedback, allowing teams to address any issues or submit additional information if necessary.

  • Final Review: After resubmitting, a final review determines the project’s total LEED points, and the certification level is awarded based on compliance.
     

5. Address Credit Interpretation Requests (CIRs)
 

  • If any credit requirements are unclear, project teams can submit Credit Interpretation Requests (CIRs) through LEED Online to get guidance from the GBCI. This helps clarify how specific credits apply to unique project circumstances.
     

6. Certification Award
 

  • Once the GBCI completes the review process, they assign a certification level (Certified, Silver, Gold, or Platinum) based on the total points achieved. This certification is formally awarded, and the building is recognized as LEED-certified.
     

Tips for Successful Documentation Submission
 

  • Plan Early: Engaging a LEED consultant at the start helps manage documentation requirements, reducing delays in the review process.

  • Organize and Review Documentation: Double-check all forms and documentation for completeness and accuracy before submission.

  • Keep a Detailed Record: Having all relevant records on hand streamlines responses to GBCI requests and ensures all project team members are aligned.

Effective documentation submission is critical to earning LEED certification, as it verifies that a project meets USGBC’s sustainability standards. Properly managed, this process demonstrates a building’s commitment to environmental performance and resource efficiency.

​

​

bottom of page